Installation of Sanitary, Watermain and storm main including services
Supply & install watermain c/w all appurtenances and testing, copper water service (Type K), 50 Water Meter, Backflow Preventer Valve for water service, Pressure regulating valve per town specification
Site Servicing, Installation of 150mm water line, Installation of 200mm Sanitary line
Installed storm sewer ranging in size and depths. Installed 33 structures including headwalls and stormceptors. Partial reconstruction of King St including full depth granular backfill and asphalt prep.
Sanitary Tee complete with road restoration including asphault
Catch basin Lead complete with road restoration including asphalt
Serviced with water service and sanitary service. Installed Doghouse, manholes and completed restorations of property ie. curb, sidewalk and asphalt.
Installed watermain as well as water services. Installed storm sewer. Installed sanitary sewer as well as services.
Complete Civil Package for new water pumping station. Building excavation and backfill as well as of watermain and of storm and sanitary sewers.
Reconstruction of Franklin Blvd in Cambridge. Completed storm sewer replacement pipe.